Assessing the Impact of Hydro Development: A Case Study of the Columbia River Basin in British Columbia Authors Susan Toller Peter N. Nemetz DOI: https://doi.org/10.14288/bcs.v0i114.1710 Keywords: Kootenay District, international relations, hydroelectric power, federal-provincial relations, Columbia River treaty Downloads PDF Issue No. 114: Summer 1997 Section Articles